Year |
Name of the Project |
Client |
Nature of Work Executed by us |
|
|
|
|
|
1 |
2008 |
Control Cabling |
M/s Al Serkal Group |
Control cabling and termination of waste oil treatment plant |
| | | | | |
2 |
2008 |
Air Dryer System – 16 Nos. Fully assembled with Container Skid – 16 Nos. |
M/s. Weatherford Pipe lines and specialty Services |
Design, Engineering, Fabrication with CE/PED Certification. |
| | | | | |
3 |
2008 |
Pipe Spools |
M/s. Weatherford |
Fabrication and supply of pipe spools |
| | | | | |
4 |
2008 |
Mixing Tank |
M/s Top oil Field |
Supply and Fabrication of mixing tank |
| | | | | |
5 |
2008 |
Fire Fighting |
M/s Dubai ports |
Supply, Installation, Testing, commissioning, fire fighting and fixing fire alarms. |
| | | | | |
6 |
2008 |
Koc-generator Installation |
M/s AL-Bhar |
SEG Generator control panel Wiring, Installation and Commissioning. |
| | | | | |
7 |
2008 |
DNV 2.7.3 Container |
J-Ray McDermott, Canada (M/s Secunda Marine) |
Fabrication and supply of 20’ and 40’ containers |
| | | | | |
8 |
2008 |
Lv panels, switch board |
M/s Dubai Ports |
Supply, installation and commissioning of LV panels |
| | | | | |
9 |
2008 |
Chimney |
M/s Al Mariah group |
Fabrication and install of 24M chimney |
| | | | | |
10 |
2008 |
1200 TR air cooled air condition system |
M/s Capex Middle East |
Supply and installation of 1200 TR air cooled system |
| | | | | |
11 |
2008 |
Break Tank |
M/s Trans Asia |
Fabrication and supply of break tanks |
| | | | | |
12 |
2008 |
Rectangular Tank |
M/S Proserv Group |
SS-316L Rectangular Tanks |
| | | | | |
13 |
2008 |
Compressor Skid – 59 Nos. |
M/s Weatherford Pipe lines and specialty Services |
Design, Engineering, Fabrication with DNV Certification. |
| | | | | |
14 |
2007 |
Fuel Storage Tank |
Tytan Oraganics Chemicals |
Engineering, Fabrication and Shop Hydro testing |
| | | | | |
15 |
2007 |
Pre Heater Water Tank & Fuel Storage Tank |
Bredero shaw Middle East Limited |
Engineering, Fabrication and Shop Hydro testing & Insulation |
| | | | | |
16 |
2007 |
Fabrication & Supply of CPI Tank |
METITO OVERSEAS LTD |
Fabrication & Shop Testing |
| | | | | |
17 |
2007 |
PIG Launchers and Receivers |
M/s. Weatherford
Pipe lines and specialty Services |
Design, Engineering, Fabrication and Shop Hydro testing |
| | | | | |
18 |
2007 |
Air Booster compressor skids – 4 nos. Certified as per code: 2.7-1 by DNV |
BJ Process and Pipeline services |
Design, Engineering, Fabrication with DNV Certification. |
| | | | | |
19 |
2007 |
EBS Cast Iron Filter Skid – 4 nos. certified as per code: 2.7-1 by DNV |
BJ Process and Pipeline services |
Design, Engineering, Fabrication with DNV Certification. |
| | | | | |
20 |
2007 |
Steam Boiler with skids and accessories. – 2 sets. certified as per code: 2.7-1 by DNV |
M/s. Weatherford
Pipe lines and specialty Services |
Design, Engineering, Fabrication with DNV Certification |
| | | | | |
21 |
2007 |
25KL Air Receiver. – 2 nos. |
SEWA (Sharjah Electricity and Water Authority) |
Design, Engineering, Fabrication and Shop Hydro testing |
| | | | | |
22 |
2007 |
Dairy Pipelines, Boiler, Chimney erection & commissioning for Del Monte foods |
Nils and Abbas Trading company L.L.C. – Dubai. |
Dairy grade pipelines fabrication and installation
Boiler supply, Chimney fabrication and installation. |
| | | | | |
23 |
2007 |
Oil & Gas Project at Kazakhstan |
Royal Econosto BV, Group Dubai |
Fabrication, Testing & Supply of Steam Pendant & Pump nozzle for low temperature application in oil fields |
| | | | | |
24 |
2006 |
Flocculator & DAF Tanks for Gasco Onshore Gas Development Phase III (Ogd III) |
METITO OVERSEAS LTD |
Fabrication & Shop Testing |
| | | | | |
25 |
2006 |
Chemical Dosing /Injection Skid |
M/s. Weatherford
Pipe lines and specialty Services |
Design, Engineering, Fabrication and Shop testing and Trail run |
| | | | | |
26 |
2006 |
CPI Separator |
Metito Overseas Ltd. |
Fabrication & Shop Testing of CPI Separator |
| | | | | |
27 |
2006 |
Silo – Qty :6 units |
M/s. ULO Systems LLC |
Design (As per ASME code) , Fabrication and Testing of 30 Tons capacity Vertical silo with Third Party Inspection and certification |
| | | | | |
28 |
2005 |
Al Ain Vegetable Processing & Canning Factory UAE |
SIG Manzini S p A Italy |
Fabrication & Testing of Storage tanks for Oil & Water (Utility)
Capacity 50, 000 litters each-4.Nos |
| | | | | |
29 |
2005 |
Separator Tank-20-M3 capacity |
M/s. ULO Systems LLC, Sharjah, UAE |
Design (as per ASME-Section VIII Div-1), Engineering, Fabrication , Shop Testing & Supply |
| | | | | |
30 |
2005 |
Oil field equipments |
METITO (Overseas)Ltd |
Fabrication ,testing and supply (oil-water separator tank) |
| | | | | |
31 |
2004 |
Arabian Packaging Co. |
WEATHER FORD Oil Field Supply Centre. Dubai, UAE |
Engineering, Fabrication and testing of Launchers (Shop tested to 53 bar) |
| | | | | |
32 |
2004 |
Freshly Frozen Foods Factory |
M/s. Nils & Abbas Trading Co LLC |
Boiler Erection, Steam, Compressor and Chilled water Piping systems |
| | | | | |
33 |
2004 |
Oil & Gas Project at Iran |
AL NEKHREH CONTRACTING CO(ANC) |
Supply and erection of Steam Boiler, Steam Pipings and complete Process Piping Systems. |
| | | | | |
34 |
2004 |
Carton Factory |
Royal Econosto BV, Group Dubai |
Design (as BS 3974 –Part-3); Fabrication and supply of Pipe supports for Oil & Gas piping |
| | | | | |
35 |
2003 |
Dairy Project |
EICO,Sharjah |
Boiler Erection, Boiler Accessories Fab. & Erection, Boiler Piping Installation and commissioning |
| | | | | |
36 |
2003 |
Laundry Project |
Hassani Foods, Dubai |
Boiler Erection, Boiler Accessories Fab. & Erection, Boiler Piping Installation and commissioning |
| | | | | |
37 |
2003 |
Cooling Water System |
MADINAT, Arabian Resorts, Dubai |
Boiler Erection, Laundry Equipments Erection, Accessories Fab. and Erection, Piping system Fab. and Installation |
| | | | | |
38 |
2003 |
Laundry Project |
CHEQPOINT, Dubai. |
Erection of Heat Exchangers, Fab. and Installation of Piping systems |
| | | | | |
39 |
2003 |
Chilled Water Piping System |
GRAND HYATT, Dubai. |
Boiler Erection, Laundry Equipments Erection, Accessories Fab. and Erection, Piping system Fab. and Installation |
| | | | | |
40 |
2003 |
Animal Feed Plant |
HYATT REGENCY,
Dubai. |
Supply and Installation of 10 ton capacity, single skin air handling |
| | | | | |
|
|
|
|
|
41 |
2003 |
Dates Honey Factory |
Emirates Flour Mill Abu Dhabi, Port. |
Boiler Erection, Boiler Accessories Fab. & Erection, Boiler Piping Installation and commissioning
|